Search
  • Robert Funk

Top Down Design saves time

Updated: Mar 1, 2018

Top Down Design or Skeletal modeling does take much more time to start but the time savings are on the revisions. Generally I will start with a dirty model (a model with constraints) or a solid in the conceptual design stage. This allows me to move fast and keep the creative juices flowing while working out the initial geometry. Next I take the pertinent parameters from the original design and start from scratch using only Skeletal modeling techniques and practices to start the project.

At this point I can bring in other designers and drafters to start building the project while still maintaining full control over the entire design.

Revisions can be and usually are the most taxing portion on a design budget but with Skeletal modeling revisions become simple and efficient (and almost enjoyable).


11 views

ABOUT Robert Funk

Robert Funk is from beautiful British Columbia Canada but has lived in Yellowknife NWT, NYC, Guadalajara Mexico and now lives in Grenoble, the heart of the French Alps. 

 Robert Has been designing for 30+ years with his first Patented product taking the world by storm and selling more than 70 million parts. 

CONTACT:
Robert Funk
robertofunko@yahoo.com
33 06 73 03 36 77
Grenoble, France, 38100
This site was designed with the
.com
website builder. Create your website today.
Start Now